Formula
How the project cost estimate works
- Material cost = area × material rate × (1 + waste %)
- Subtotal = material cost + labor cost + delivery
- Total = subtotal + contingency + tax
Free project planning tool
Combine material waste, labor, delivery, contingency, and tax into a transparent planning total.
Formula
For a 250 sq ft project with material at 4.25 per sq ft, labor at 3.50, 10% material waste, 100 delivery, 5% contingency, and 7% tax, the calculator builds each part into one clear planning total.
Common questions
No. The currency selector labels your estimate. Enter material, labor, and delivery costs in that same currency.
A small, well-defined project may use a lower contingency than renovation work with hidden conditions. Choose a value that matches the project risk.
No. It is a planning estimate based only on your inputs and should be compared with supplier prices and professional quotes.